GPS Guidance Systems: Auto-Steer Basics
Pick a correction level for the job
Compare pass-to-pass accuracy with repeatability across days or seasons. Broad tillage and return-to-row placement can have different tolerances. Identify correction coverage and whether the receiver can continue through intermittent cellular or satellite service. Include base station or network subscriptions in the quote.
Test offsets and operator handover
Measure antenna and implement offsets, create test lines and check them against physical markers. Test controlled headland turns and how the operator disengages the system. Check guidance separately when the implement can drift on slopes. Maintain supervision and follow the safe operating instructions.
Example
A line that looks excellent while planting may be several inches away when you return to cultivate unless repeatability and offsets were verified.
Put it into practice
Check local correction coverage and record offsets. Compare physical reference points on separate days to verify the repeatability you need.
References
AEF ISOBUS compatibility database and supported functions, Iowa State Extension farm machinery ownership and operating cost estimates.